La Isla Mérida Malltertainment

Mérida, Mexico · 2018 · Assistant Architecture Manager

A vibrant shopping and entertainment destination in Mérida, blending retail, leisure, and waterfront experiences within a naturally lit, climate-controlled environment.

Opened
December 2018
Size
GBA 150,000 m² · GLA 58,000 m²
Investment
USD 120M
Location
Mérida, Mexico
Duration
3 years
Architectural design
ArqStudio
Architect of record
Urbania
Project manager
Alejandra García
My role
Assistant Architecture Manager

Overview

Developed by GICSA, La Isla Mérida Malltertainment is a major retail and entertainment destination in Yucatán, Mexico. The development brings together more than 120 shopping, dining, and entertainment options, complemented by an artificial lake, a Ferris wheel, and recreational spaces designed for the local community.

As Assistant Architecture Manager, I supported the architectural and multidisciplinary coordination process, reviewing technical documentation, coordinating design changes, and working closely with construction teams to ensure the project was delivered in line with its design intent.

Project Concept

Inspired by the original La Isla Shopping Village concept introduced in Cancún in 1999, La Isla Mérida reinterprets the atmosphere of an open-air village through varied façades, materials, colors, and landscaped pedestrian spaces.

Unlike its coastal predecessors, the Mérida development was designed as an enclosed, climate-controlled shopping center to respond to the city’s warm and humid climate. A translucent ETFE roof allows natural light to fill the commercial walkways, creating the feeling of an outdoor environment while providing the comfort of an air-conditioned space.

The development is organized across two commercial levels above underground parking, with landscaped walkways, fountains, and gathering spaces connecting its different areas. Outside, a waterfront boardwalk overlooks an artificial lake, offering restaurants, entertainment attractions, and spaces for events and everyday leisure.

Together, these elements create a destination that goes beyond shopping, bringing architecture, entertainment, and community life into a single experience.

My Role & Contributions

  1. 01

    Multidisciplinary Coordination

    Supported coordination between architectural and MEP consultants, reviewing design interfaces and identifying technical inconsistencies.

  2. 02

    Design & Documentation

    Reviewed and updated architectural drawings, details, and construction documents to maintain accuracy and consistency across disciplines.

  3. 03

    Technical Information Management

    Organized and consolidated project documentation, supporting communication and information flow between design and construction teams.

  4. 04

    Architectural Site Supervision

    Conducted site visits to review architectural execution, resolve design-related issues, and verify alignment with project specifications.

  5. 05

    Finishes & Supplier Coordination

    Reviewed finish quantities and specifications, coordinated with suppliers, and evaluated alternatives based on cost, quality, and availability.

  6. 06

    Architectural Detailing

    Developed flooring layouts and architectural details, integrating the project’s landscape design into the commercial spaces.

Challenges & Outcomes

  • 01

    Architectural Complexity

    The shopping village concept incorporated unique storefront geometries and an extensive palette of materials and colors. I supported regular design reviews and site coordination to resolve discrepancies and maintain consistency with the architectural concept.

  • 02

    Structural Integration

    The prefabricated construction system limited flexibility for the curved architectural forms. Additional steel framing was incorporated to accommodate the design, requiring coordination between architectural and structural requirements.

  • 03

    ETFE Roof Installation

    The translucent ETFE roof required careful handling and installation sequencing to prevent damage. The team coordinated the completion of interior façades before membrane installation, reducing the risk of damage during construction.

  • 04

    Design Change Management

    More than 75 change orders arose throughout the three-year construction period. I supported the review and coordination of architectural revisions, helping resolve technical issues and maintain continuity between design and construction.